Which floors can be nailed down
The flooring manufacturer must approve the boards for mechanical fastening. We check the condition, thickness and flatness of the wood subfloor and whether it can hold the specified fasteners.
How the boards are laid and fastened
We plan board direction, stagger joints, and lay out the first and last rows before fastening. The flooring instructions determine the fastener type, spacing, edge clearances and any moisture-control details.
What goes into the estimate
Removal and disposal, loose or uneven subfloor sections, stair nosings and transitions are priced according to the project. Wider boards may call for supplemental adhesive when the flooring manufacturer permits or requires it.
NWFA wood flooring installation guidelines
What to send for an estimate
Send the board width and product name, approximate area and any information you have about the existing floor and wood subfloor.
Request an estimate


