Check product and substrate compatibility
The engineered flooring manufacturer must approve the glue-down method and substrate. We check the slab or wood subfloor for flatness, soundness and moisture before selecting the adhesive system.
Prepare the floor and set out the boards
Low areas, contaminants and old adhesive may need attention before installation. We plan the starting lines and transitions, then use the adhesive, trowel and coverage specified for the flooring assembly.
Plan access and finish details
We coordinate stair nosings, door clearances and adjacent flooring heights. The adhesive system determines cure time before furniture and traffic return. For condos, include any approved acoustic assembly in the scope.
Mirage engineered flooring installation guides
What to send for an estimate
Send your engineered hardwood specifications, square footage, substrate details and photos of thresholds.
Request an estimate




